Jack Grahan order in House Flipper House Flipper Guide and Walkthrough
Last update: 18 May 2018
You don't have much work to do in the task commissioned by Jack Grahan. Standard wall radiators should be installed in two rooms, as you did in the first order. Then go to the bathroom.
You'll see the pipes above the washing machine, and when you move the cursor over the pipes, you notice which component needs to be fitted. In this case it is a bathroom radiator (towel radiator in Installations). On the opposite wall you can see the installation place of the last element of the fixture - the sink.
Choose mountable sink from the Bathroom section because it is the cheapest one - you bear the cost of buying items that you equip the apartment with. But before you can install it, remove the cap (E) from the pipes. You will receive very little for your order, just about $800.